I will now finish off the basement drywalling. I hope to get the taping crew in before the end of the week but we'll have to see how their schedule interacts with mine.
A few other jobs we did this week was to install cement board above the shower stalls to accept future tiling. As well I installed the venting system for the stove vent.
Here are a few pictures showing the final result of all the drywalling. The house hasn't looked this clean in weeks.
Here is a picture of the cement board over one of the showers as well as the vent termination outside for the stove. This vent sits proud of the wall by 4" due to future brick work that will occur once the weather gets a little warmer.
Well now we need to finish the basement drywall and hopefully by the next time I talk to you we'll also have a taping crew working in the house. Until then keep warm thoughts in your heart because it's cold outside.
Harold